104国道工程

  • Bridge

    项目

  • 工期

  • 9.91km^2km^2

    施工面积

项目详情

    The reconstruction project of Pingyang Guo Zhuang to Chenxia à section of National Highway 104 is 9.91 kilometers long. It is of Class I highway standard and asphalt concrete pavement, with a design speed of 80 kilometers per hour, two-way four lanes, and a roadbed width of 24.5 meters, of which 4.5 meters of auxiliary lanes are added on both sides of the crossing section of Kunyang Town, and the roadbed width is 33.5 meters. The total project investment is 602 million.